The exponential growth of AI workloads is fundamentally reshaping data center power requirements. Server rack densities are jumping from 2 kW to over 120 kW — creating power fluctuations that challenge both grid and campus infrastructure. Meanwhile, data centers face lengthy interconnection queues and aging grid infrastructure that can delay critical projects for years.
But there’s good news for all stakeholders — battery energy storage systems (BESS) offer a fast and cost-competitive path to flexible interconnection, reliable cutovers, and pristine power quality.
In this webinar, energy experts from FlexGen and Orennia will examine the leading pain points experienced by data center operators, owners, and developers in the AI era. They will discuss how utility-scale BESS are uniquely positioned to not just solve them, but also accelerate their speed-to-power.
Attendees will get insights into:
- Accelerating interconnection timelines through interruptible connection strategies supported by battery storage
- Leveraging BESS to replace traditional UPS systems and diesel generators with scalable, 4-8 hour backup power solutions
- Managing AI workload power volatility with millisecond-fast cutovers and real-time power stabilization
- Implementing advanced energy management software to maximize BESS performance, safety, and operational uptime
This session is built for data center developers, owners, and operators seeking forward-thinking strategies to tackle today’s operational challenges — while planning for the evolving energy landscape ahead.
Can’t join us live? Register for the event to receive a recording.


